Mama and I spent some time last night mowing and trimming.
Neither of us felt very energetic but those activities are ones that can be
done with a minimum of mental acuteness; and it seems to be a never ending
chore. We have nothing to complain about. The recent rains have caused the
grass to grow and if we want it to look nice that growing grass has to be kept
mowed and edged. Last summer we mowed twice – all summer long. This year we are
mowing twice a week.
The rains are forecast to begin again this evening. It is
not hard to imagine they will be significant. When I walked out of the apartment
this morning the air was very cool. The temperature was 61®. That is almost a
forty degree drop from last weekend. Whenever there is that much of a disparity
in the temperatures there is bound to be some strong weather activity
following.
In preparation for the impending storms I double checked the
damaged areas on the apartment roof and made sure the remaining porch roof was secure.
At this point we can only pray that we can get the rain without the subsequent
damage from very high winds or hail. The repairs are forthcoming; I plan to
order the metal today.
Once I get the metal and lumber in place I should be able to
make the needed repairs in a very long Saturday. It is one of those projects that
requires a completion once it is begun. There is not a good stopping point
between starting to pull off the damaged roofing and replacing it. In the middle
you have an open hole in your roof – not a recommended practice no matter where
you live.
Since I will be doing the work by myself I will try not to
get too far ahead of myself. I am still pacing through the project in my mind. While
I have large portions of the roof off I am planning to replace the insulation I
removed to prevent damage to the ceiling when it got soaked. A “pop-up” shower
during that time would be most unpleasant.
I have yet to contact the sheetrock company to get a bid on the
cost of the repairs needed on the apartment ceiling. I thought it best to
finish the work on the roof prior to getting that appointment set up. There are
three areas that need to be redone and I would rather have someone who does it
for a living do the work.
The pace of work at the office has picked up drastically in the
past few weeks. As some of the larger projects I am working on begin to reach
completion the number of little decisions required to finalize each of them
also accelerates.
That is where I am right now.